Don't forget to use two 9' copper earth ground rods wired in series with #6 solid core ground wire to the panel ground landing.
Interestingly, the rods need to be 9' earth covered but not necessarily driven vertically. what you want is grounding to damp soil. If you are lucky and have an iron well casing that is the ideal earth ground.