1. Connect a hand pump with a
clamp on fitting (Any bicycle Hand Pump should work) to tank valve.
2. Open the toggle valve marked
No. 1 in Fig 3 (move toggle up) and inflate the first airmount until the left
front corner of the platform rises approximately 1/2 of an inch. Deflate if necessary by pushing the control
valve in.
3. Close the toggle valve (move
toggle down).
4. Repeat the previous two
steps for the second and third airmounts respectively, until the platform
floats freely.
5. Check to see if the platform
is floating freely by pressing down and pulling up by hand on the platform top
at each airmount location and releasing.
If the platform does not float freely, inflate or deflate as necessary. Check for and remove any obstructions that
may inhibit platform movement.
6. If properly inflated and
level, floating height should be approximately 4 inches all around.
7. Replace the "Tank
Valve" cover to minimize seal leakage during operation.
If you would like me to send you the full manual please just send me your e-mail.
HAPPY LISTENING,
Steve
SOS