Dedicated Circuits - Subpanel importance?


My system is no more. Sold everything. Starting from scratch. Thanks to you and seven months of experience I am doing the following, which is taking care of the number one component, the room:

  1. Treating. The full GIK order in October is starting to arrive.
  2. Running one or more dedicated circuits.

I am addressing #2 in this post. There are extensive discussions here and one can spend hours if not days trying to wring-out the critical details needed for a DIY solution. I have spent hours and there a few things I need to confirm before I proceed because I was unable to find definitive answers.

I am doing this myself. I do not want or need lectures on only having a licensed electrician do this work. I have been doing my own electrical work for many years and am very comfortable doing so.

  1. Does a subpanel help? Is it required? Subpanels are typically supplied from a breaker off of the main panel's bus, so I'm guessing there is no advantage in terms of SQ? Perhaps if I can independently ground the subpanel it might make a difference?
  2. Opening up my walls is not an option, so I need to use conduit. This may restrict the number of lines if the wire should not share the same conduit? If I am restricted to Romex 8 or 10,2 versus metal-clad, is it okay for two runs to occupy the same conduit?
  3. How much better is metal-clad? Is it required vs Romex? Will metal conduit accomplish the same result with Romex?

Answers to these questions will complete my plans and I will go forward at speed. Hopefully this discussion helps others as well even if it's to know what to have their electrician setup for them.

Thank you!

 

 

 

 

128x128izjjzi

Showing 2 responses by erik_squires

Consider a Furman with LiFT and SMP.  Living in an apartment until recently I always could hear when the Furman was missing from the system.

Does a subpanel help? Is it required? Subpanels are typically supplied from a breaker off of the main panel’s bus, so I’m guessing there is no advantage in terms of SQ? Perhaps if I can independently ground the subpanel it might make a difference?

 

The big advantage of a subpanel is the heavy gauge wiring to the main panel as well as the convenience of short local circuits. The heavy gauge will reduce any possibility for voltage drop that you would get from running 12 or 14 gauge wiring given the same current.

Always follow the National Electric Code for grounding, which means NO independent ground.

Do put in a panel surge suppressor on your main panel and sub panels.