Foundation Research V5 tops them all. Custom assembly made specifically for the cartridge to be used. Hence, no switches. From the ground up, well engineered with built quality being first rate. Two key areas are addressed in its design, Mechanical & Electrical Isolation. There is a waiting list and delivery is 8 to 12 weeks ARO. At 6K, there is none better, even at double or triple the cost.