VPI SCOUTMASTER UPGRADE TO ?


I currently have a VPI Scoutmaster and considering an upgrade. To go to the Super Scoutmaster which includes to the best of my knowledge the following: 1. HRX motor assembly, 2. Outer ring and inner clamp 3. SDS controller
Also I would consider the new JMW-9 signature Arm. The total cost of the above would be about $6000.00, about $3500.00 out of pocket to upgrade. Would I be better off
selling my Scoutmaster, take a loss and purchase something
else? Any thoughts would be appreciated.
kjl

Showing 1 response by chazzbo

I wonder about Scoutmaster ingenral.Whyb not a Blackknight ordered with better bearing and platter.I know that there are two reason (oposing) in physics with short verus longer arms but since I am not going change VTA every damn LP I play keeping the 9 especially since it can be gotten with better wiring is a nice idea.When I bought my extended Aries Mike the head VPI tech told me that while the VPI can use the flywheel the Aries actaully sounded better without it.Now I see thatanother in the plethora of options they offer is to replace the tall motor (for Aries,Blackknight,Scoumaster(?1?) combines what one assumes is the new 300 rpm with the flywheel.Well at least you can get anti skatingg device which everyone (including Wally of Wally tools who of course says his is better before he had set eyes on the VPI model).Well with over 90,000 tables out there with the VPI moniker on the who can blame then for offering more upgrades.Just rips me that some aren't backward compatible like the ring overpriced as it may be can't fit earlier models which when introduced were "S.O.T.A).I know that I don't Need size of my current rig and have buyer but have to be carefull in which table to go with.Nice to know that you can turn the Scoutmaster into a super without new plinth.But Blackknight can be upgraded till cows come how either with new 9" arm OR by goinmg to 10.6.Just tired of how damn big the exetended is inmy little apt.
Chazzbo