Likely not code north of the border yet would be my guess
New power service
I had a new power service put into my home today. I needed to service my new woodshop. So had a 200 amp service put in upgraged the 100 amp service that was here.Anyhow while I was at it I paid the extra to make sure the feeds were all copper and removed the aluminum out of the power delivery to my home. The old meter base when they removed the old meter was burnt wondering if there was a short in the meter at some time in the past
Anyhow new copper wire new meter and meter base and even though the amps are not warm.yet everything has taken a large step up. It was special before it is scary good now.
Showing 6 responses by retiredfarmer
@lak I have 6 dedicated lines into my room. All on 20 amp circuits all on the same leg of the box. All the wires are the same length in the wall to the receptacles. Mostly furutech rhodium top of the line receptacles 55 if I remember the number correctly and two with the top of the line gold receptacles. Everything needs a week to settle in but first reaction is a huge change for the better. Got rid of the aluminum wire and the new wire is copper. And with the old meterbase that was burnt out of the power delivery a total of a huge difference. Thinking that I had most of it right or close to it that the power feed into the house showed how bad it was. Lol I was trying to make a silk purse out of a sows ear. I was surprised at the betterment I was hoping that I would not be down grading. I never would have had this done but I needed more power for my woodshop. So the woodshop produced its first beautiful piece of art!
Regards |
@carlsbad yes that is likely the burns look old the service to the house was redone 20 years ago and likely that is when it happened. I was luck because the house is in an area where they upgraded the wiring so I can put in the two hundred amp service. At one point if electric cars really end up coming about I got the service upgrade for free except my end after the meter. That will not stay that way if everybody wants that. |
@jea48 no it is underground from the back alley. I had the line hydro vaced so the cuty did not have to splice the line to the new service the line goes into the garage and main panel there and the house is a sub pannel now instead of the other way around. I didn't like that idea but from a practical standpoint that was the only way. I read one time that dan de agustino paid the utility company to change the wire to copper all the way back to the transformer that fed his house. It was a few blocks and cost a small fortune at the time. He went on to say how much better his system was. Lol thirty years later i thought i would make sure i had copper feeding the house. Lol i dont have that kind of cash to go all the eay to the transformer but copper from the city's junkson box to the meter and from the meter to my house. |
@soix if you do decide to look into it. Have them take the meter off the meter base that took about half a minute the meter has a couple of large spades that push into the receptacle. Lol kind of like a king sized plug in. I should see if I can take a picture of mine and post it. Thinking a bunch of magis is from the meter base replacement. Thinking I might end up listening to the different receptacles and plugs on power cords again things have changed enough it will likely be easier to come to a judgement but a fellow might change his mind.
Regards |
@ erik_squires what would you suggest for one. I have never cares for any type of surge protector in my system tried a bunch years ago and I just gave up on the idea and plugged everything directly into the receptacles. Most years I unplug the solid state stuff during thunderstorm season and listen to the tube system instead it gets turned off each use. |