Nautiliser...
If the unit has a switch, the cost is zero.
If there is a jumper plug, perhaps internal, cost is trivial. Pop the cover and take a look.
If the transformer has split primary winding (almost all equipment does) the (fair) cost is 1/2 hour of labor.
If the transformer is not split winding, get a different piece of equipment.
If the unit has a switch, the cost is zero.
If there is a jumper plug, perhaps internal, cost is trivial. Pop the cover and take a look.
If the transformer has split primary winding (almost all equipment does) the (fair) cost is 1/2 hour of labor.
If the transformer is not split winding, get a different piece of equipment.