Thanks, Valve & Vinyl.
Dumb question: Does "blocking" refer to connecting joists with shorter pieces of wood (16" apart around here)?
The blocking could be hard to accomplish given that I just installed insulation between all joists.
I also may have screwed up because I didn't see your post before hitting the hardware store today.
I purchased a 4"x4"x8' and 2 adjustable floor joist jacks (the local hardware store only had 2) such that they are near the minimum of their range. I positioned the 4x4 so that it was perpendicular to the joists (it's supporting 6 joists). I used the jacks under the 4x4. I figured I would see how well it worked and then add more if necessary (I would need possibly 2 4x4x4' & 1 more 4x4x8' to cover it, given the pipe situation).
Does the method you suggested (hole + patio stone + pier) replace what I did above? It sounds like it does...and it sounds like a more elegant solution.
Should I not add the 2-3 additional 4x4's w/ jacks? The jacks (36") are like $30 a pop.
Thank you!!!
Dumb question: Does "blocking" refer to connecting joists with shorter pieces of wood (16" apart around here)?
The blocking could be hard to accomplish given that I just installed insulation between all joists.
I also may have screwed up because I didn't see your post before hitting the hardware store today.
I purchased a 4"x4"x8' and 2 adjustable floor joist jacks (the local hardware store only had 2) such that they are near the minimum of their range. I positioned the 4x4 so that it was perpendicular to the joists (it's supporting 6 joists). I used the jacks under the 4x4. I figured I would see how well it worked and then add more if necessary (I would need possibly 2 4x4x4' & 1 more 4x4x8' to cover it, given the pipe situation).
Does the method you suggested (hole + patio stone + pier) replace what I did above? It sounds like it does...and it sounds like a more elegant solution.
Should I not add the 2-3 additional 4x4's w/ jacks? The jacks (36") are like $30 a pop.
Thank you!!!