I did that using a/market cable all the way. Pls note, the above apply, so:
A) done by a certified electrician (we have those in Europe, surely in the US too), preferably with experience in high voltage INDUSTRIAL applications. b) You STILL have breakers, PER piece of equip -- or the electrician won't do it. c) the cable used MUST be certified or otherwise cmply to standards (mine is "triple" insulation single-core). d) the insurers know about this (they think you're nuts, anyway).
BTW, I'm happy with the sound!
Good luck to your bro...
A) done by a certified electrician (we have those in Europe, surely in the US too), preferably with experience in high voltage INDUSTRIAL applications. b) You STILL have breakers, PER piece of equip -- or the electrician won't do it. c) the cable used MUST be certified or otherwise cmply to standards (mine is "triple" insulation single-core). d) the insurers know about this (they think you're nuts, anyway).