They tested the line from the street to my meter. I don’t know what they tested exactly. Is that the same thing?
At our place, the power quality survey took four weeks. They installed a special meter at our service panel from which they downloaded data once a week for four weeks. The initial visit entailed checking the voltage on the lines, checking the connections at the service panel and power pole, and testing continuity of all the breakers.
So, not the same thing.