Next pay the extra $$ and have copper wire installed from the electric meter to the main electrical panel, not aluminum. The utility companies wire to the meter will be aluminum, nothing you can do about that.This would be for an underground service hook up. If the service will be fed overhead have the electrical contractor install copper wire for the service drop also to feed the meter socket. Again the utility company's feed from the pole to the weather head will be aluminum.
The utility companies wire to the meter socket will be aluminum, nothing you can do about that.
Dedicated circuits? Bldng a new house. Help.
I am in the process of having a house built. I have a 50/50 theater/music system, mostly all Linn stuff, and I am very ignorant about electrical power. My stuff is all currently plugged into a Tice power conditioner, except the amps are plugged directly into the wall. I do not have ANY dedicated circuits. They are all sharing.
I have 2 amps,processor,dvd player,cd player,xbox 360, cable box,and a plasma.
Since I am building, obviously this is the time to do what I need to do. So please help. How many dedicated circuits? What plugs into each one? What do I do with the Tice? What kind of outlets?
Thanks.
I have 2 amps,processor,dvd player,cd player,xbox 360, cable box,and a plasma.
Since I am building, obviously this is the time to do what I need to do. So please help. How many dedicated circuits? What plugs into each one? What do I do with the Tice? What kind of outlets?
Thanks.
6 responses Add your response