Laugh back....Get another electrician.
It makes a difference. I had the electrician run 3 20 A circuits to Furutech outlets. The extra wire and time for 2 additional runs did not add much to the cost. I have a line for each amplifier and the 3rd for everything else. In hindsight I might have done a 4th to separate the analog and digital components.
Keep it simple, don't worry about grounding or transformers. You can always figure that out later if you want the challenge.
It makes a difference. I had the electrician run 3 20 A circuits to Furutech outlets. The extra wire and time for 2 additional runs did not add much to the cost. I have a line for each amplifier and the 3rd for everything else. In hindsight I might have done a 4th to separate the analog and digital components.