With regards to running everything through one outlet, what are the limits to this? One Outlet/single circuit are rated to handle only so much?
Being my rig is split
- class A monos and dual subs behind spkrs all plugged into a good 4 plug distribution box (no conditioning) which is then plugged into single outlet on front wall
- my “front end” rack off to the side all plugged into a conditioner (tube pre, tube dac, streamer end point, fiber converter, LPS’s) and conditioner plugged into one outlet on aids wall.
Not that this is uncommon, but is the key in this config for all components in their respective “area” to be all plugged into a single distribution block, conditioner etc..?
i thought about running sep circuits but sev people in my circle say don’t bother as the power sub stations where we are are located have been “updated” and money would be better spent in other areas.
Being my rig is split
- class A monos and dual subs behind spkrs all plugged into a good 4 plug distribution box (no conditioning) which is then plugged into single outlet on front wall
- my “front end” rack off to the side all plugged into a conditioner (tube pre, tube dac, streamer end point, fiber converter, LPS’s) and conditioner plugged into one outlet on aids wall.
Not that this is uncommon, but is the key in this config for all components in their respective “area” to be all plugged into a single distribution block, conditioner etc..?
i thought about running sep circuits but sev people in my circle say don’t bother as the power sub stations where we are are located have been “updated” and money would be better spent in other areas.