Thanks again ,S23chang. for such illustrative and helpful informations.
On setup D - is it 2-pair of identical cable with stacking up the spades on both end with the jumper remained in place ? or having the 4 spades connected to Upper and Lower spkr binding post / while only 2 spades connected to Amp end (jumper removed)
I really need your confirmation ,please
Thanks
Simon
On setup D - is it 2-pair of identical cable with stacking up the spades on both end with the jumper remained in place ? or having the 4 spades connected to Upper and Lower spkr binding post / while only 2 spades connected to Amp end (jumper removed)
I really need your confirmation ,please
Thanks
Simon