Having upgraded my power cords to Frey2 from wall to an QB4 , and then Frey 2 to feed my Accuphase E-470 , and for the moment using
Heimdall 2 to feed my Lumin T1 , i can only say it was a real lift..i started out with the Heimdall 2 , and then it moved up the chain ( speaking from wall placement ) as one other said they really do need a long break in , i think if i remember correctly Nordost says 100 hours , in my experience it takes longer to really fall into place. So have patience.
And having tried Valhalla2 Powercord , is also really good , had it on trial.
Heimdall 2 to feed my Lumin T1 , i can only say it was a real lift..i started out with the Heimdall 2 , and then it moved up the chain ( speaking from wall placement ) as one other said they really do need a long break in , i think if i remember correctly Nordost says 100 hours , in my experience it takes longer to really fall into place. So have patience.
And having tried Valhalla2 Powercord , is also really good , had it on trial.